Fabricated Flanged Pipework

The diagram above shows typical arrangements for Flange pipework. Please contact us for the full range. All are manufactured to suit and normal lead times are 7-10 working days. Shorter delivery times can be arranged.

Standard drilling is NP16 with NP10 and NP25 also available. The maximum length is 5800mm. Coatings for EN545 are cement lined internal and bitumen external, cement lined seal coated internal, blue epoxy external. Coatings for EN598 are High Alumina cement lined internal, red epoxy external. Other coatings are available on request.

 